Low Energy Home Finishes
What is Included:
-
Architect drawings for planning permission
- Timberframe structure fully enclosed and insulated to U value 0.15w/m2k
-
Insulated roof, felted, battened and tiled
-
Internal wall with service area provided ready for plaster boarding
-
Foundation completed with concrete, steel, insulation and finished floor
-
Underfloor heating pipes
-
Windows & Doors
-
Window Sills
-
External Plastering
-
1 * metre footpaths all around
-
Fascia & Soffit,
-
Gutters and Down Pipes
Note: Passiv House U Value 0.11w/m2k on request
-
Air to Water Heat Pump
-
Alu Radiators upstairs (if applicable)
-
Internal slabbing
-
Internal plastering
-
Electrical 1st & 2nd fix
-
1st & 2nd fix joinery
-
Stairs (if applicable)
-
Bathroom ware
-
Painting of all walls undercoated in white
Generous allowance for:
-
Kitchen
-
Floors
-
Tiling
-
Painting
Basic
Finish
Builders
Finish
Turnkey
Finish